T&J Constructions successfully completed the construction of three biofiltration basins, including full earthworks, basin wall formation, and all associated drainage layers. Each basin was excavated to the required design levels and shaped to form stable batters and structural walls in accordance with the IFC drawings. Works included trimming, formation of the basin footprints, establishment of design benches, and creating uniform and stable side walls to ensure longterm performance and integration with the adjoining Linear Reserve corridor.
Following earthworks, we installed the complete drainage layer systems for all basins, including the placement of gravel drainage layers, transition sands and, where applicable, filter media and geotextile separation as required in typical biofiltration basin specifications. Underdrain pipework, inlets, outlets and connection points were installed to facilitate proper hydraulic function and controlled discharge back into the reserve drainage network. Despite the challenging winter conditions, our team successfully managed water flows and maintained the integrity of the drainage layers throughout construction, ensuring each basin met quality, stability and design requirements.
PROJECT CHALLENGES
- Carrying out earthworks, drainage installation, and biofiltration basin construction during winter presents significant technical and environmental challenges. Throughout the winter delivery period, we were required to temporarily control water flows to maintain safety, protect the works, and ensure compliance with environmental obligations.
- Completing the project in winter significantly impacted construction due to wet ground, continuous water ingress, and the need for temporary water flow diversions. Despite these challenges, the works were successfully managed through proactive water control, resequencing, and ongoing environmental and safety measures.
KEY CONSTRUCTION PROCESSES
- Site establishment and staging
- Clearing, topsoil stripping and bulk earthworks to achieve all design levels
- Construction of all bio-filtration basins, including excavation, formation of batters, drainage layers, filter media and underdrains
- Installation of associated stormwater infrastructure, pits, inlets, outlets and scour protection
- Shaping and grading of the Linear Reserve and all tie-ins to adjoining lots and corridor boundaries
- Landscaping including topsoil respread, planting, turfing and establishment works
- Quality assurance testing, as-constructed documentation and handover
LOCATION
Tonsley
CLIENT
Greenhill Engineering
CONTRACT VALUE
$2,900,500
CONSTRUCTION PERIOD
Jan 2024 – Jan 2026