Fort Largs Development is a 150 Lot Development at the old Fort Largs Police Training Barracks.
SEWER COMPONENT FOR FORT LARGS
Stage 1A
- 190mm Sewer installation down Strathfield Terrace – DIT Road
- Each day the opened trenched was surveyed and backfilled so that the road could be used by traffic
- Use of Shoring boxes due to sand
- Use of Vac truck for locating services
- Depth started at 2.6m rising to 1.9m
- Due to the sand the sewer pipe required more protection, geofabric was placed on the pipe bed and ran up the sides of the trench. Once the pipe was laid and backfilled the geofab was folded over the top to wrap it like a present, protecting the pipe for as much sand as possible – this method was used for the entire project.
Stage 1B – Sewer Subdivision
- Sewer connections to 82 lots
- 600m of 150mm pipe
- 400m of 225mm pipe
- 210m of 125PE pump main
- 4 manholes hyrdro tested with ferropre and double mastic with tar paint and primer
- Depth of Services ranged from 6m to 1.6m
- MSJ’s installed – 11
- IO’s installed – 7
Stage 3
- Sewer connections to 34 lots
- 165m of 150mm sewer pipe
- Manholes – 1
- MSJ’s – 1
- IO’s – 3
- Depth 3.2m to 1.8m
- Laying away from existing 150mm sewer from Stage 1B, depth ranged from 3.2m to 1.8m
- % existing OB risers to dig down on and connect into the lots
- 2 permanent IO ends
- 1 temp IO end
- Present wrapping method used for backfilling sewer
Stage 4
- Sewer connection to 35 lots
- 100m of 150mm
- Manholes – 1
- Maintenance Shaft – 1
- Short run of sewer compared to previous stages, depth ranged from 3m to 1.7m
- 2 permanent IO ends installed
- Numerous K5 and K6 lot connections
Stage 5
- Sewer connections to 40 lots
- 300m of 150mm sewer
- Manholes – 1
- IO’s – 3
- MSJ – 4
- Numerous grade changes in stage 5
- K6 and K18 lot connection installed
Pump Station
- Installation of 7m pump station with control manhole in sand
- Valve chamber installation
- Electrical Isolation cabinet
- Switchboard cabinet
- Odor Dome and Access Pit
- Back Flow Prevention
- Flow Meter Chamber installation
- 200m of 125PE 100 PN16 fusion welded pumping main installed
PROJECT CHALLENGES
- Works in a Coastal Marine environment
- Site primarily beach sand
- Works in and around Heritage Fort Largs
- Works on a historical contaminated site – site remediated by others
- DIT works under live traffic
LOCATION
Fort Largs
CLIENT
PEET Limited
CONTRACT VALUE
$15,000,000.00
CONSTRUCTION PERIOD
Aug 2022 – Jan 2024