DESCRIPTION OF PROJECT

Hurtle Grove Development was an existing winery with vineyards that was purchased by Tarac Properties Pty Ltd to redevelop into 77 residential allotments.

PROJECT CHALLENGES

  • Presence of vine roots within earthworks
  • Ground level slope significantly creating difficult working conditions especially in wet conditions
  • Sewer, Water and Stormwater live connections on existing network
  • Sewer and Stormwater works on live road i.e. Traffic Management and dealing with local Council
  • Retaining wall interface with existing properties on Western Boundary
  • Subcontractor availability

KEY CONSTRUCTION PROCESSES

  • Strip Topsoil
  • Earthworks
  • Sewer Water and Stormwater infrastructure
  • Electrical and NBN infrastructure
  • Retaining walls
  • Pavement
  • Kerbing and footpaths
  • Asphalt
  • Line marking and Signage

LOCATION

Old Reynella

CONTRACT VALUE

$7,100,000.00

CONSTRUCTION PERIOD

October 2021 – August 2022

CLIENT

Tarac Properties Pty Ltd

STAGE 1

STAGE 2