The installation of a stormwater system along three separable portions of road for Town of Lobethal. Construction took place during a string of local events, which T&J Constructions were mindful of, and implemented certain management systems to ensure as little public disturbance as possible. The stormwater system installed also ran adjacent to Lobethal’s primary water main, which T&J Constructions came up with a unique and SA Water approved way of reinforcing so that the job didn’t require town’s water supply to be turned off.
KEY CONSTRUCTION PROCESSES
- Establish Traffic Managment
- Demolition of road, footpath and existing pits
- Excavation of trenches on roadside
- Removal and disposal of existing pipes
- Installation of junction boxes, pipes and pits
- Headwall installtion
- Trench backfill
- Bitumen overlay
- Reinstatement of footpath, kerbing and pavement
- Support of stobie poles within working zones
LOCATION
Woodside, Lobethal
CONTRACT VALUE
$240,000
CONSTRUCTION PERIOD
October 2015 – May 2016
CLIENT
Adelaide Hills Council