DESCRIPTION OF PROJECT

The installation of a stormwater system along three separable portions of road for Town of Lobethal. Construction took place during a string of local events, which T&J Constructions were mindful of, and implemented certain management systems to ensure as little public disturbance as possible. The stormwater system installed also ran adjacent to Lobethal’s primary water main, which T&J Constructions came up with a unique and SA Water approved way of reinforcing so that the job didn’t require town’s water supply to be turned off.

KEY CONSTRUCTION PROCESSES

  • Establish Traffic Managment
  • Demolition of road, footpath and existing pits
  • Excavation of trenches on roadside
  • Removal and disposal of existing pipes
  • Installation of junction boxes, pipes and pits
  • Headwall installtion
  • Trench backfill
  • Bitumen overlay
  • Reinstatement of footpath, kerbing and pavement
  • Support of stobie poles within working zones

LOCATION

Woodside, Lobethal

CONTRACT VALUE

$240,000

CONSTRUCTION PERIOD

October 2015 – May 2016

CLIENT

Adelaide Hills Council